TAK works hand in hand with their clients and their design team to minimize change impacts, fast-track projects for on-time completion, and to produce high quality results within budget constraints.
Our internal structure facilitates efficient decision-making through open communication between executive-level leadership, and regional and on-site management staff.
TAK’s professional project and construction management staff includes high caliber and seasoned project managers, superintendents, engineers, scheduling and cost control specialists, as well as accountants to provide our clients with expert guidance and consultation on construction planning, estimating, scheduling, and client move-in/start-up.
TAK offers the below in-house resources:
Our level of professionalism and experience is second to none. TAK’s team oriented approach focuses on project delivery through collaboration and coordination from concept to completion.
We are an in-house real estate developer, construction manager, general contractor and asset/property manager across all real estate classes. From project conception to completion we maintain our promises of designing and completing high-quality properties across multiple sectors. Whether the need is for ground-up development and construction, full-building renovation, lease-up or asset management, we have the market expertise.
The TAK Group’s experience is proven with a track record of success having developed, constructed, or acquired over 10 million square feet of assets within residential, commercial, retail, healthcare, and hospitality markets.
We strive to anticipate, understand, and add value for our clients. We maintain open lines of communication with our clients and seek to become their trusted partner.
Integrity
We conduct our business operations in a fair and ethical manner. We strive to always do the right thing and have our client’s best interests in mind.
Accountability
We are there for our clients and we fulfill all of our commitments.
Respect
We treat all individuals with courtesy and respect at all times. We pride ourselves on helping one another succeed.

A 48 Unit Multi-Family building, under-going approvals. TAK is developing, constructing, and managin

g the project. Expected date to break ground: June 2017.



TAK showed its exemplary attention to detail during the concrete foundation work while coordinating with NJ Transit for embedded track and wheel truing equipment installation requirements. TAK diligently coordinated its subcontractors for timely completion of the wheel truing pit utilities.
The Wheel Truing building consisted of structural steel frame/masonry construction with EPDM roofing and EIFS wall panel system. The work included an infrared heating system, sprinkler system, an HVAC/MUA system, jib cranes, and finish work.
TAK maintained the fast-tracked pace of this project despite numerous design changes and a lack of reliable as-builts and sufficient utility documentation. TAK overcame this difficulty by coordinating heavily with the designers and existing utility companies and by performing subsurface investigation and exploratory work. TAK worked closely with the USCG for successful shut downs and wet taps performed both at night and during the weekend to minimize service disruptions.
The project also allowed TAK to successfully demonstrate our value engineering abilities through proposed modifications approved by the designers. With the extensive amount of design changes during the project, the design team welcomed TAK’s proposals to assist in minimizing cost impacts to the project.
TAK proved our ability in marine construction by delivering this fast-tracked project on time despite severe winds and winter weather during pile driving operations and underwater welding operations. The work included the construction of two docks along with extensive electric, communication, sanitary and utility work. The first was a floating dock with a walkway fixed at the shore and included a new fueling station. The fueling station included a new concrete encased aboveground diesel fuel tank with secondary containment and a leak detection system. The second dock was served by underground utilities which were run 3,000 lf from the first dock location. A new prefab building was installed and electric service was provided for a future building.


The first phase of the project included the construction of the new fueling facility. The facility consisted of a new Locomotive Shed and adjacent fuel tank pad housing four 12,000 gal aboveground diesel storage tanks, a waste oil tank, and a motor oil tank. TAK installed new fueling operation equipment including a new diesel fuel crane, a heated motor oil dispenser & hose reel system, a sand storage bin & transporter system, FRP track drainage collector pans, a Veeder Root tank monitoring system, aboveground piping and emergency generator and lighting. Once the new facility was on-line, TAK relocated the existing crew facilities and personnel adjacent to the new fueling facility. The existing facility was demolished and contaminated soil was removed. The final phase of the project included the construction of the new Crew Quarters building. The masonry/load bearing steel framed structure featured a manufactured roof panel system and EIFS wall panel system. Sitework included exterior utilities, asphalt pavement and guiderail.